External Workforce Management for Plant Construction

Plant engineering is a project-based business. Personnel requirements change with each project phase, from planning and design through manufacturing and installation to commissioning.

For plant engineering companies, this means that—in addition to their own staff—additional skilled workers and external service providers are needed depending on the project phase. At the same time, multiple projects, locations, and suppliers must be coordinated.

EMS supports plant engineering companies through managed services, helping them centrally manage their external workforce—whether through temporary staffing, service contracts, or contracts for work and services.

Each project phase changes staffing requirements

A plant construction project does not necessarily require the same skilled workers from start to finish.

The planning and design phases focus on different skill sets than those required during installation or commissioning. As the project progresses, capacity requirements, work locations, and the necessary technical expertise therefore shift.

It is precisely this dynamic that makes the workforce in plant engineering particularly challenging.

The question is not just how many employees a project requires. What matters most is which skilled workers are needed at what time, at which location, and for how long.

When Project Needs Turn into an External Workforce

If an organization’s own capacity is insufficient for a project phase, external employees and staffing agencies come into play.

Plant mechanics, industrial mechanics, mechatronics technicians, electronics technicians, welders, or assembly technicians, for example, can provide additional capacity for specific project phases. Engineers, design engineers, project managers, and commissioning specialists may also be needed, depending on the project’s requirements.

However, with every additional external employee, the organizational burden also increases. With multiple staffing agencies and concurrent projects, this can quickly result in a complex workforce.

Many projects. Many service providers. A workforce problem.

For example, a plant engineer works on several projects at the same time.

One service provider is hired for installation, and another for commissioning. Other specialists are procured through existing framework agreements or on a project-by-project basis. Each area has its own points of contact, processes, and data.

This raises questions such as:

  • Which service providers are currently working on which project?
  • Which external employees are assigned to which location?
  • What needs are still outstanding?
  • What are the costs per project?
  • Which suppliers deliver reliably?
  • How is the
  • workforce change with the next project phase?

Without centralized control, the answers are often scattered across different systems, files, and communication channels.

From Installation to Commissioning

The requirements for the external workforce change throughout the plant construction project.

01

Planning and Design

In the early stages of a project, for example, engineers, design engineers, and project managers may be needed. As the project progresses, staffing needs shift toward manufacturing, assembly, and technical implementation.

02

Manufacturing

In manufacturing, additional technical specialists may be needed to expand capacity on a project-by-project basis.

03

Assembly

Once assembly begins, the staffing needs change once again. Industrial mechanics, plant mechanics, electronics technicians, welders, and other assembly workers may be needed for specific project phases.

04

Commissioning

Specialized technical personnel and commissioning engineers are involved in the commissioning process. At the same time, staffing requirements may already begin to decrease compared to the installation phase.

The workforce must follow the project

This is exactly where External Workforce Management comes in. The workforce is not viewed in isolation, but rather in the context of the project, demand, service provider, and assignment.

Project Phase → Staffing Needs → Service Providers → External Specialists → Deployment → Costs → Reporting

A Managed Service Provider provides a central management layer for this purpose.

EMS helps standardize processes, centrally coordinate staffing agencies, and consolidate relevant information about the external workforce.

Typical Workforce Scenarios in Plant Engineering

Covering Project Peaks

An order creates a short-term need for additional staff that cannot be fully met by our own employees.

Solution: The external workforce is integrated in a structured manner through defined processes and multiple service providers.

Centrally Manage the Assembly Phase

Additional skilled workers are needed to install a system. The employees come from various staffing agencies and work at the project site for a limited period of time.

Solution: A centralized process provides transparency regarding needs, service providers, and assignments.

Multiple plant construction projects running concurrently

Several projects are underway at the same time, and some of them rely on the same staffing agencies.

Solution: MSPs and VMSs consolidate processes and provide a cross-project overview of the external workforce.

Changing the Workforce Between Project Phases

During a project phase, many installers are needed. Once installation is complete, the demand decreases, while different roles become relevant for commissioning.

Solution: The external workforce is planned and managed throughout the course of the project.

An example from the project business

A plant engineering firm receives several orders, some of which are carried out simultaneously. Additional industrial mechanics, electronics technicians, and welders are needed for the installation. Part of the staffing needs is met through an existing staffing agency, while other skilled workers are sourced through different suppliers.

Meanwhile, commissioning has already begun on another project. Without centralized management, disparate processes for requirements, feedback, assignments, and costs quickly emerge.

With a centralized MSP process, staffing needs are systematically tracked and the involved service providers are coordinated. A VMS digitally maps the relevant information. Reporting makes it clear which suppliers are providing which services and how the workforce is evolving across the projects.

Individual staffing needs are transformed into a manageable external workforce.

How an MSP Is Changing the Plant Engineering Industry

Decentralized

Project A → Service Provider 1
Project B → Service Providers 2 and 3
Project C → In-house process

Different requirements.
Different data.
Different points of contact.

Centrally controlled

Projects
↓
core needs
↓
Structured Service Provider Management
↓
external workforce
↓
centralized reporting

This creates transparency regarding projects, service providers, and external staff without having to review each staffing need individually.

Plant Construction & External Workforce: A Brief Explanation

What is External Workforce Management in Plant Engineering?

External Workforce Management involves the structured planning, recruitment, management, and administration of external employees. In plant engineering, this is particularly relevant when staffing needs vary across different project phases and multiple service providers are involved.

Why is an external workforce particularly important in plant engineering?

Plant construction projects proceed through various phases. As a result, staffing needs, required skill sets, and work locations change as the project progresses. External workforce can provide additional capacity for specific project phases.

What does a managed service provider do in the plant engineering industry?

An MSP handles the central coordination of defined processes related to external workforce. This includes, for example, demand management, supplier management, process standardization, and reporting.

What types of skilled workers are needed in plant engineering?

Depending on the project, there may be a need for plant mechanics, industrial mechanics, mechatronics technicians, electronics technicians, welders, assembly workers, engineers, design engineers, and commissioning technicians, among others.

How can multiple staffing agencies in the plant engineering sector be managed?

An MSP establishes a centralized process for collaborating with multiple suppliers. This allows requirements, feedback, and relevant metrics to be standardized and made comparable.

Get in Touch With Us!

Get in touch now and take the first step towards your solution – we’re ready when you are.

Christian Ratte-Polle von EMS

Christian Ratte-Polle

Head of Managed Services

To improve readability, we have chosen not to use gender-neutral language in some instances on this website. In the spirit of equal treatment, all references to people apply to all genders. If a phrase is not gender-neutral, this is solely for the sake of readability and should not be interpreted as a value judgment.